Northern Bypass Extension Project – MOTA-ENGIL AFRICA

QuarryDescription: The Northern Bypass is the highway that connects the Eastern and Western highways of Uganda without going through the center of the city. It is a government funded project whose extension contract was awarded to Mota-Engil Africa. Reasonant Contractors Limited was subcontracted to provide street light installations along the roundabouts on the Northern bypass.

Reasonant Contractors Limited was contracted to setup the Mota- Engil Africa head offices in Kololo. This included installations of Air conditioners, CCTV and networking. The working relationship also has a running maintenance and support contract for Mota-Engil Africa for its Uganda and Rwanda establishments.

Campsite Project – MOTA-ENGIL AFRICA

Security CameraDescription: Mota-Engil Africa set up a campsite base at Namanve from where all the operations, to be carried out during the Northern Bypass extension project, will be coordinated. Reasonant Contractors Limited was contracted to carry out the distribution of power from the transformer to all the blocks at the campsite which include the office block, the canteen block, the laboratory block, the industrial area, the precast crane area and the 28 houses blocks.

Reasonant Contractors Limited also contracted to setup a data communications network (LAN IP-PBAX Extensions) and a CCTV security system at the Campsite.

Quarrysite – MOTA-ENGIL AFRICA

Backup GeneratorDescription: Reasonant Contractors Limited was subcontracted by Mota-Engil Africa to carry out electrical, data communications and air conditioning systems installations for the offices and residence at the quarrysite on Gayaza road.

A standby generator for the quarry operations and the residence was also installed.

Security cameras were supplied and installed in and around the quarry and a solar backup system was also supplied to enable 24-Hour functioning of the security system.

.      

Electrical Lights and Communication Installations – KIGALI AIRPORT

Kigali-International-Airport-Extension-420x315Description: Reasonant Contractors Limited was subcontracted by Mota-Engil Uganda to supply and install electrical lights and communications systems for the Kigali International Airport extension. 

Electrical, Communications and Air conditioning installations were also done for the setup of the Mota-Engil Africa offices, residence and Campsite in Kigali.

The Sound Cup Cafe CCTV – SOUND CUP

Haks-Bond-420x315Description: The Sound Cup Cafe is a coffee shop which is located at Garden City shopping mall in Kampala city. In order to have a fully functional security system, the coffee shop required a CCTV system. Reasonant Contractors Limited was contracted to design and install a fully functional and effective CCTV system.

CCTV system at Britania Allied Industries – HOUSE OF DAWDA GROUP

SurveillanceSystemsDescription: Britannia allied Industries Ltd has five separate plants for production of biscuits, confectionery, powders, fruit juice and drinking water which all require monitoring via CCTV systems. Reasonant Contractors Limited was contracted to design, supply and install a fully functional and effective CCTV system in the Production Department and an annual maintenance contract for this system is also in place.

Street Lighting in Entebbe Municipal Council – DOTT SERVICES


LIGHTDescription:
During the preparation for CHOGM 2007, Dott Services sub contracted Reasonant Contractors Limited to carry out the Street Lighting in Entebbe Municipal Council and Kampala District Under the beautifying the city Project.      

Generator Installation and maintenance – LEA ASSOCIATES


LEA ASSOCIATESDescription:
Reasonant Contractors Limited was contracted to provide generator & Maintanace services and also carry out the installation of an automatic Generator at the residence offices in Kamwokya.

Communication and Air conditioning – RWANDA HIGH COMMISSION

ConnectivityDescription: Reasonant Contractors Limited setup a communications network at the embassy and installed air conditioning systems, security systems which included 20 remotely viewed CCTV cameras for offices. All installed systems have a running maintenance contract

The Earth protection system was refurbished to suit the existing office block.

Electrical, Communication and Air conditioning – ECOBANK UGANDA

Eco-420x315Description: Reasonant Contractors was subcontracted by Uptime Solutions Limited for Electrical wiring, air conditioning and communications installations at all branches and Dropdown ATM branches.

Generator Installation and maintenance – MAYBACK MOTORS

Generator Installation and maintenance – MAYBACK MOTORSDescription: Reasonant Contractors Limited was contracted to provide electrical wiring and installations at the Mayback Motors premises on Gaba road. A standby Automatic Generator of 30kva was also installed and a data communications network connecting up to 30 computers was also setup.

Electrical and CCTV Installation and maintenance – HAKS INVESTMENTS LTD

Electrical and CCTV Installation and maintenance – HAKS INVESTMENTS LTDDescription: Reasonant Contractors Limited supplied and installed a CCTV system of 30 cameras having remote viewing around the premise.  We also carried electrical wiring and installations around the bond area.

Electrical Installation and maintenance – RIVERNILE PUBLISHERS

nrm-420x315Description: Reasonant Contractors Limited carried out electrical wiring and installation at the RiverNile Publishers factory which involved balancing and programming the machinery on three phase power setup.

Solar system Installation – DABANI GIRLS SCHOOL

solarDescription: Dabani Girls School is a girls secondary school found in Busia district. Reasonant Contractors Limited was contracted to supply and install a solar power system on Ejulun block in the school.

Inverter and UPS Installations – NRM SECRETARIAT

NRMDescription: Reasonant Contractors Limited supplied and installed a 3024 Triplite inverter for the lights and 8 KVA-APC UPS for the server room and other sockets in offices.    

Inverter and UPS Installations – POWER FM

Inverter and UPS Installations – NRM SECRETARIATDescription: Reasonant Contractors Limited supplied and installed a 15kvA stabilizer and an outback inverter for the mast backup.      

Security System Installations - MASAKA REGIONAL REFERRAL HOSPITAL

fp1-eng Description: Masaka Regional Referral Hospital is a hospital in the city of Masaka, in south-central Uganda. It is the referral hospital for the districts of kalangala, lyantonde, Masaka, Sembabule, Kalungu, Lwengo, Bukomansimbi, and Rakai.

Reasonant Contractors Limited supplied and Installed 3 digitised CCTV cameras, a biometric staff clocking in machine and a PVC Identity card printing machine at the hospital to especially be used in the critical areas on the maternity ward for security purposes.